[gtranslate]

Clean Air Metals releases more positive results from Escape Deposit Steepledge Extension



Clean Air Metals CEO Abraham Drost joined Steve Darling from Proactive to share new assay results from the 2022 drill campaign from the Escape Deposit at the Thunder Bay North Project.
Drost telling Proactive Hole ELR22-115 intersected 15.0m grading 1.73g/t Platinum (Pt), 1.92g/t Palladium (Pd), 0.70% Copper (Cu) and 0.30% Nickel (Ni) from 237.5m-252.5m downhole including 2.8m grading 2.86 g/t Platinum (Pt), 3.05g/t Palladium (Pd), 1.18% Copper (Cu) and 0.38% Nickel (Ni) from 246.40-249.18m downhole.

source