Novo Resources: Significant Drill Results at Becher
2024-02-13 07:09:44 HIGHLIGHTS More than 10,500 m of combined aircore (AC) and reverse circulation (RC) drilling completed by De Grey Mining (ASX: DEG) at the Becher Project in Q4 2023, as part of the Egina earn-in/JV RC drilling at Lowe confirmed gold mineralisation associated with a deformed intrusive sill, with a best intercept of 8 […]
Novo Resources: Further Standout Becher Gold Results Highlight Encouraging Growth Potential
2023-05-23 06:08:20 HIGHLIGHTS Ongoing aircore (“AC”) drilling at Novo’s 100%-owned flagship Becher Project continues to deliver promising results, with over 10,000 m of the planned Q2 2023 20,000 m program complete. Becher is located in the northern section of the Egina Gold Camp 28 km along trend from De Grey Mining Limited’s 10.6 Moz Au […]
Novo Resources: Drilling Underway at Highly Prospective Becher Project
2023-05-05 06:12:51 HIGHLIGHTS +20,000 m aircore (“AC”) drilling program underway in the northern Egina Gold Camp at Novo’s flagship Becher Project, located in the Pilbara, Western Australia. Becher is situated adjacent to De Grey Mining Limited’s 10.6 Moz Au (JORC 2012)1 Mallina Gold Project and 2.5 km south of their new Withnell South discovery2. New […]
Novo Resources: New ‘Hemi Style’ Gold Targets Identified for Immediate Drilling at Becher
2023-03-06 07:32:02 HIGHLIGHTS The Becher Project is located ~28 km WSW of De Grey Mining’s 10.6 Moz Au (JORC 2012)1 Mallina Gold Project (includes the Hemi deposit) and is Novo’s focus for its next drilling program. Analysis of 2022 Becher aircore (“AC”) drilling assay results has identified high-priority structural and intrusion-related targets which […]
Novo Resources: Significant Results from Becher with Target Priority Areas Identified
2023-02-14 07:00:28 HIGHLIGHTS The Becher Area target is located in the northern section of the Egina Gold Camp along trend from De Grey Mining Limited’s 10.6 Moz Au (JORC 2012)1 Mallina Gold Project. Aircore drilling completed in 2022 on broad regional lines (640 m) focused on ENE trending gold-fertile structural corridors and has […]
Novo Resources: Becher Area Mineralisation Expands With More Standout Results
2022-11-30 05:11:16 Reverse circulation (“RC”) drilling has commenced in the Becher Area, with two rigs now testing prospects within 216 sq km of highly prospective, under-explored Mallina Basin geology on the Egina Project along trend from De Grey Mining Limited’s Hemi Gold Deposit. Standout gold results received from aircore (“AC”) drilling at the […]
Novo Resources: Standout Results From Becher Aircore Drilling Along Trend From Hemi Gold Deposit
2022-10-27 07:25:33 HIGHLIGHTS Standout gold results have been intersected on the southern Irvine Shear corridor including 20 m @ 0.67 g/t Au, as part of the current aircore drilling program at the high priority Becher Area in the Egina District. Over 650 shallow aircore holes for 16,500 m of the > 30,000 m […]
Novo Resources: High-Quality Gold Targets Advanced at Purdy’s North, Becher Area, and Nunyerry
2022-09-06 10:18:53 Comprehensive exploration update regarding large-scale exploration programs underway across Novo’s highly prospective 11,000 sq km portfolio of Pilbara tenements (Figure 1). Purdy’s North reverse circulation (“RC”) drilling is ongoing at the Morto Lago gold-copper target with drilling intersecting several zones of quartz-veining and alteration, with assays pending. Morto Lago is adjacent […]