EVNi Clean Nickel(TM) R&D – Preliminary Results Confirm Carbon Capture and Storage (“CCS”) Potential of the CarLang Area
2023-04-20 04:03:35 CO2 reactive minerals were observed throughout the CarLang Area’s A Zone 46 of 50 samples indicated presence of brucite and hydrotalcite group minerals that are highly reactive to CO2 Indicates potential for direct capture of CO2 from air, advancing now to quantifying the total potential EVNi will engage an independent quality and assurance […]
EV Nickel Announces Filing of NI 43-101 Technical Report for Previously Announced CarLang Project Maiden Resource
2023-04-12 04:04:07 Defined a resource which puts it into the league of the largest undeveloped nickel deposits in the world[1]. A Zone Resources total 1.0B tonnes, averaging 0.24% Ni and 0.0107% Co (0.12% NiEq cut-off), split between: Higher Grade Core with 290M tonnes at 0.27% Ni Indicated and 203M tonnes at 0.27% Ni Inferred. Lower […]
EV Nickel Defines Resource Estimate at CarLang’s A Zone, 1.25m Indicated and 1.16m Inferred Tonnes of Contained Nickel- A Zone Represents First 20% of the Full CarLang
2023-02-28 05:03:02 Defined a resource which puts it into the league of the largest undeveloped nickel deposits in the world1 A Zone Resources total 1.0B tonnes, averaging 0.24% Ni and 0.0107 ppm Co (0.12% NiEq cut-off), split between: Higher Grade Core with 290M tonnes at 0.27% Ni Indicated and 203M tonnes at […]
EV Nickel Phase 3 Drilling Results: The A Zone Continues to Deliver and Covers Less Than 15% of the Potential CarLang Trend
2022-12-07 05:09:11 Reports assay results from 3 additional holes, Intersections included: hole EV22-29 with 262.6m grading 0.25% Ni, hole EV22-30 with 259.7m grading 0.26% Ni, and hole EV22-32 with 200.4m grading 0.25% Ni. The CarLang Area is a >10km prospective trend of dunitic units, confirmed by […]
EV Nickel Phase 3 Drilling Preliminary Results: Confirms New Large-Scale Nickel Zone at CarLang
2022-10-24 04:05:48 The CarLang Area is a >10km prospective trend of dunitic units. 1.4km of the prospective strike was drilled this summer, with 28 holes totalling 8,295m. Assays from the first four holes have been received, with wide intercepts of dunite hosting Large-Scale nickel mineralization, ranging from 400m to 500m interpreted thickness, […]