Arizona Sonoran Copper Drills 547 ft (167 m) of 1.14% CuT at Parks/Salyer

2023-03-27 03:33:26 CASA GRANDE, Ariz. & TORONTO / Mar 27, 2023 / Business Wire / Arizona Sonoran Copper Company Inc. (TSX:ASCU | OTCQX:ASCUF) (“ASCU” or the “Company”) infill drilling at the Parks/Salyer (“P/S”) Project continues to demonstrate grades and thicknesses supportive of an underground operation within the planned Prefeasibility Study, expected by Q1 2024. The […]

Marimaca Copper Oxide Drilling Encounters Higher than Expected Grades at Marimaca North; intersects 30m at 2.18% CuT from 46m, 464m at 0.45% from 4m

2022-11-21 04:32:29 VANCOUVER, British Columbia, Nov. 21, 2022 (GLOBE NEWSWIRE) — Marimaca Copper Corp. (“Marimaca Copper” or the “Company”) (TSX: MARI) is pleased to announce further results from the 2022 infill and extensional drilling campaign at the Marimaca Oxide Deposit (the “MOD”). Results reported are for a total of 7,102m across 35 reverse circulation (“RC”) drill […]

Probe Metals Infill Drilling Returns Significant New Intersections, Including up to 15.1 g/t Au over 7.4 metres (cut), at Monique, Val-d’Or East Project

2022-10-18 03:45:38 Highlights: Results of the infill and expansion drill campaign continue to demonstrate growth and improvement in the Monique Deposit and mine plan, updated resource for Monique deposit expected by year end and, for Pascalis and Courvan trends in Q1 2023 Infill drilling continues to strengthen resource and return significant new intersections grading […]

 Arizona Sonoran Copper Drills 254 ft of 1.34 % CuT from Parks/Salyer

2022-08-23 03:39:10 CASA GRANDE, Ariz. & TORONTO / Aug 23, 2022 / Business Wire / Arizona Sonoran Copper Company Inc. (TSX:ASCU) (“ASCU” or the “Company”) announces assays from the final 6 drill holes at the Parks/Salyer (“P/S”) Project to complete its initial 12-hole (27,722.6 ft | 8,450 m) exploration program (see FIGURES 1-10). These results […]

Arizona Sonoran Copper Drills 479 ft of 1.32 % CuT from Parks/Salyer and Announces an 80,000 ft (24,400 m) Drilling Program

2022-06-23 03:34:08 CASA GRANDE, Ariz. & TORONTO / Jun 23, 2022 / Business Wire / Arizona Sonoran Copper Company Inc. (TSX:ASCU) (“ASCU” or the “Company”), an emerging US-based copper developer and near-term producer, announces an additional 3 drill holes (6,440 feet | 1,960 metres) from its initial 12-hole exploration program at the Parks/Salyer (“P/S”) Project, […]