Kiboko Gold Drills 4.2 g/t Au Over 5 m at its Harricana Gold Project

2023-07-10 13:09:55 All assays from Phase 1 exploration program have been reported Maiden pit-constrained mineral resource targeted for Q3-2023 KELOWNA, British Columbia / Jul 10, 2023 / Business Wire / Kiboko Gold Inc. (TSXV: KIB) (“Kiboko” or the “Company”) today reported results from the remaining 25 holes (4,846 metres (“m”)) of its systematic 70-hole (11,269 […]

Kiboko Gold Drills 2.7 g/t Au Over 8.1 m and 8.5 g/t Au Over 2 m at Its Harricana Gold Project Located 55 km North of Val-d’Or, Québec

2023-06-20 05:37:58 Kiboko’s drilling along Marcotte zone continues to verify historical results Assays from 43% of metres drilled in Phase 1 are still to be reported Maiden pit-constrained mineral resource targeted for Q3-2023 KELOWNA, British Columbia / Jun 20, 2023 / Business Wire / Kiboko Gold Inc. (TSXV: KIB) (“Kiboko” or the “Company”) today reported […]

Kiboko Gold Drills 0.6 g/t Au Over 35 m, 6.1 g/t Over 1 m, and 1.0 g/t Over 5 m, Plus Multiple Occurrences of Visible Gold on Its Harricana Gold Project

2023-05-31 05:25:29 Gold mineralization intercepted in 7 of 8 drillholes Visible gold observed in drill core with assays pending Assays from 61% of metres drilled in Phase 1 (36 holes over 6,853 m) still to be reported Re-assay program verified preliminary results Drilling expected to verify historical results for use in mineral resource estimation Maiden […]

Kiboko Gold Provides Update on Harricana Drill Program

2022-12-05 07:35:57 ROUYN-NORANDA, Quebec, Dec. 05, 2022 (GLOBE NEWSWIRE) — GLOBEX MINING ENTERPRISES INC. (GMX – Toronto Stock Exchange, G1MN – Frankfurt, Stuttgart, Berlin, Munich, Tradegate, Lang & Schwarz, LS Exchange, TTMzero, Düsseldorf and Quotrix Düsseldorf Stock Exchanges and GLBXF – OTCQX International in the US) is pleased to update shareholders as regards the work […]