Frontier Lithium PFS Demonstrates Pre-Tax NPV US$ 2.59 Billion

2023-05-31 11:28:50 SUDBURY, ON, May 31, 2023 /CNW/ – Frontier Lithium Inc. (TSXV: FL) (“Frontier” or “the Company”) is pleased to release the strong results of a Pre-Feasibility Study (“PFS”) for a proposed mine-to-lithium hydroxide chemical/hydromet plant facility (“Integrated Project”) in the Great Lakes Region of North America. The PFS assumes a hydromet plant that would […]

Faraday Copper Announces PEA for Copper Creek with NPV US$713M and 4.2 Billion Pounds of Measured and Indicated Copper Mineral Resources

2023-05-03 14:29:17 VANCOUVER, BC / ACCESSWIRE / May 3, 2023 / Faraday Copper Corp. (“Faraday” or the “Company“) (TSX:FDY) (OTCQX:CPPKF) is pleased to announce the results from a Preliminary Economic Assessment (“PEA”) and an updated Mineral Resource Estimate (“MRE”) for its Copper Creek Project, located in Arizona, U.S. (“Copper Creek”). The PEA provides an economically […]

Nouveau Monde Graphite Issues Positive Results of Preliminary Economic Assessment for Uatnan Mining Project – One of the World’s Largest Graphite Projects in Development with Indicative NPV in Excess of C$2 Billion

2023-01-10 08:05:19 Preliminary economic assessment of the Uatnan Mining Project demonstrates attractive economics for a targeted production of approximately 500,000 tonnes of graphite concentrate per annum over a 24-year life of mine, making it one of the World’s largest graphite projects in development. The Uatnan Mining Project covers Mason Graphite’s Lac Guéret graphite […]

Mason Graphite: NMG Issues Positive Results of its Preliminary Economic Assessment for the Uatnan Mining Project – One of the World’s Largest Graphite Projects in development with Indicative NPV in Excess of C$2 Billion

2023-01-10 07:35:32 Preliminary economic assessment of the Uatnan Mining Project demonstrates attractive economics for a targeted production of approximately 500,000 tonnes of graphite concentrate per annum over a 24-year life of mine, making it one of the World’s largest graphite projects in development. The Uatnan Mining Project covers Mason Graphite’s Lac Guéret graphite […]

Namibia Critical Metals Announces Positive Preliminary Economic Assessment for the Significantly Expanded Lofdal Heavy Rare Earth Project “2B-4” With $632.7 Million Pre-Tax NPV

2022-10-03 06:19:39 HALIFAX, NS / ACCESSWIRE / October 3, 2022 / Namibia Critical Metals Inc. (“Namibia Critical Metals” or the “Company” or “NMI”) (TSXV:NMI) (OTC Pink:NMREF) is pleased to announce the results of its Preliminary Economic Assessment (“PEA”) for the Lofdal Heavy Rare Earth Project “2B-4” (“Lofdal” or the “Project”) in Namibia. This PEA aims […]

O3 Mining Completes Pre-Feasibility Study For Marban Engineering with Post-Tax NPV of C$463 Million, Unlevered IRR of 23.2% And Annual Production Of Over 160Koz Gold

2022-09-06 03:13:48 TORONTO, Sept. 6, 2022 /CNW/ – O3 Mining Inc. (TSX.V: OIII) (OTCQX: OIIIF) (“O3 Mining” or the “Corporation”) is pleased to announce the completion of the Pre-Feasibility Study (“PFS”), prepared in accordance with the National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”), for its 100% owned Marban Engineering gold project, in […]

Voyager Metals Reports after Tax NPV Of US$1.6 Billion and IRR of 43% For Its Preliminary Economic Assessment at the Mont Sorcier Magnetite Iron and Vanadium Project in Quebec

2022-07-25 03:06:50 TORONTO, ON / ACCESSWIRE / July 25, 2022 / Annual average EBITDA of US$348MM and average annual free cash flow of US$235MM over 21 year life of mine (“LOM”) Annual production targeted at approx. 5.0 million tonnes of high grade, low impurity, iron concentrate grading ~65% iron with 0.52% V2O5 per tonne of […]

Noram Lithium: Zeus PEA shows 31% After-Tax IRR USD$1.299 Billion After-Tax NPV

2021-12-08 00:46:47 VANCOUVER, BC / ACCESSWIRE / December 8, 2021 / Noram Lithium Corp. (“Noram” or the “Company”) (TSX – Venture: NRM / Frankfurt:N7R / OTCQB:NRVTF) today announced the summary results of a National Instrument 43-101 compliant Preliminary Economic Assessment (“PEA”) for the high-grade lithium deposit at its wholly-owned Zeus Lithium Project (“Zeus” or the […]

AbraSilver Resource Corp. Announces Robust PEA of Diablillos Including After-Tax NPV of US$364M

2021-11-29 05:30:25 Economics Demonstrate Potential for a Highly Economic Oxide Silver-Gold Development Project Toronto – TheNewswire – November 29, 2021: AbraSilver Resource Corp. (TSXV:ABRA) (OTC:ABBRF) (“AbraSilver” or the “Company”) is pleased to announce the results of a Preliminary Economic Assessment (“PEA”) for its wholly-owned Diablillos project (“the Project”) in Salta Province, Argentina. The PEA […]

ScoZinc Mining Announces Improved Results of Its Scotia Mine 2021 Pre-Feasibility Study: Pre-Tax NPV of C$174M and IRR of 69%

2021-11-16 07:42:33 Halifax, Nova Scotia–(Newsfile Corp. – November 16, 2021) – ScoZinc Mining Ltd. (TSXV: SZM) (“ScoZinc” or the “Company“) is pleased to announce the results of its updated Pre-Feasibility Study (the “2021 PFS“) including its new Gypsum NI 43-101 Mineral Reserve Estimate (“2020 Mineral Reserve Estimate“) for its wholly-owned and permitted Scotia Mine (“Scotia […]