Brixton Metals Samples 50% Copper at Val, 32.8% Copper at Metla and 152 g/t Gold at the Trapper Target, Thorn Project
2023-01-20 05:41:13 VANCOUVER, British Columbia, Jan. 20, 2023 (GLOBE NEWSWIRE) — Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to report the surface rock sample results from the Metla, Trapper, Val and East Targets and drill assay results from the Metla Target. These are the remaining assays from the 2022 […]
Brixton Metals Drills 19.25 g/t Gold over 11m within 139m of 2.14 g/t Au all within 187.5m of 1.6 g/t Au at the Trapper Target on its Thorn Project
2021-11-12 07:24:39 VANCOUVER, British Columbia, Nov. 12, 2021 (GLOBE NEWSWIRE) — Brixton Metals Corporation (TSX: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce initial assay results from its maiden drill program at the Trapper Gold Target on the Thorn Project. These results represent the first three of fifteen shallow drill holes that […]