Cabral Gold CEO Alan Carter joined Steve Darling from Proactive to share results from three diamond-drill holes on two sections in the southern part of the primary Central gold deposit at the Cuiú Cuiú Gold Project. The Central gold deposit is located 5km northwest of the MG gold deposit and 2.5km southeast of the PDM target

Carter telling Proactive these results including 9.6m @ 16.4 g/t gold from 164.3m including 1.2m @ 112.0 g/t gold from 166.9m and 2.1m @ 11.5 g/t gold from 170.2m seem to define a high-grade corridor of mineralization exists within the core of the primary basement Central gold deposit.

source

Leave a Reply

Your email address will not be published. Required fields are marked *