[gtranslate]

Tocvan Ventures back on Pilar Project in Mexico with at least 5000 metres of drilling



Tocvan Ventures Director Brodie Sutherland joined Steve Darling from Proactive to share news the company is getting crews back to work at their Pilar Project in Mexico. The works program includes a minimum of 5000 metres of drilling.

Sutherland also shared with Proactive the company will be trenching for bulk sampling material that will be used for column leach studies along with that drilling.

Sutherland also shared with Proactive more about their Private Placement that is currently underway.

source